To ensure you apply your sealant in the most beneficial way, please follow these instructions and/or watch the application video. 
Preparation
Application
- Ensure surface to be treated is clean and bone dry.
 - Application should only be completed if the surface temperature is between 10-30 degrees celsius.
 - Test product in an inconspicuous area and allow 24 hours to ensure desired results are achieved prior to treating entire surface.
 
Application
- Apply one coat of undiluted sealant with a low pressure sprayer or a lambswool applicator from left to right.
 - Immediately apply a second coat in the opposite direction.
 - Together, this equates to two wet-on-wet coats.
 - Ensure there is no excess or pooling.
 - An additional wet-on-wet coat may be applied by repeating steps 1-3, to ensure complete coverage.
 
After sealing 
After sealing, ensure you follow best practice in the maintenance of your surface. Download our maintenance guide here.



